SECI releases EOI to set up 1000 MWh Battery Energy Storage System

Battery energy storage concept in nice morning light. Battery energy storage with renewable energy sources - photovoltaic and wind turbine power plant farm. 3d rendering.

Mar 15: Solar Energy Corporation of India Limited (SECI), a Govt. owned company under MNRE has released an Expression of Interest for setting up 1000 MWh Battery Energy Storage Systems (BESS) on 14th October 2021.

Central Electricity Authority (CEA)/Ministry of Power (MoP) has prepared a Report on Optimal Generation Capacity Mix for 2029-30. The Report identifies Pumped Hydro Storage System (PSP) and Battery Energy Storage Systems (BESS) as the commercially deployed solutions for providing requisite storage capacity. As per the report, a Battery Energy Storage capacity of 27,000 MW/108,000 MWh (4-hour storage) is projected to be part of the installed capacity in 2029-30.

The Standard Bidding Guidelines for procurement and utilization of   Battery Energy Storage Systems have been finalized.

This information was given by Shri R. K Singh, Union Minister for Power and New and Renewable Energy in a written reply in Rajya Sabha today.

***

Disclaimer: We donot claim that the images used as part of the news published are always owned by us. From time to time, we use images sourced as part of news or any related images or representations. Kindly take a look at our image usage policy on how we select the image that are used as part of the news.